10th Avenue Bridge - Vancouver, Washington

This two-lane steel bridge will span the gap above Whipple Creek. The project calls for one travel lane going in each direction, bicycle lanes, and storm water treatment facilities.

The bridge will enhance traffic circulation and make it easier for emergency responders.

The 10th Ave Bridge was designed with longevity in mind. Whipple Creek has sensitive environmental species so the designers envisioned a project that would leave the area untouched after its completion.

 

GENERAL INFORMATION
• Location: Vancouver, Washington
• Type: Vehicle / Pedestrian Bridge
• Completed: Fall 2018

TECHNICAL DETAILS
• Design: Concrete / Steel
• Height: 48 ft. Above Whipple Creek
• Length: 350 feet

DESIGN & CONSTRUCTION
• Owner: Clark County Public Works
• Engineer: Cascade Bridge, LLC
• Contractor: Cascade Bridge, LLC
• Steel Fabricator: Fought & Company

Previous
Previous

Concourse E - Portland, Oregon

Next
Next

Portland International Airport Pedestrian Bridge - Portland, Oregon